Poster profile ssbn ng (to choose)

      0 Reviews
      €66.58

      DISPLAY IN HD

      Choose your poster among the 4 SNLE-NG: Le Triomphant, Le Téméraire, Le Vigilant or Le Terrible 

      In-Stock
      Dimensions
      Choix du bâtiment
      Quantity

      The so-called "new generation" nuclear submarines were launched in 1994, with the first-of-the-line "Le Triomphant".

      Longer, wider, more massive, the new SSBNs are also much more discreet than the "Le Redoutable" submarines, thanks to a design aiming to suspend all noisy elements on silent-blocks.

      At their start (1997) they embarked M45 missiles, then M51 missiles with a range of nearly 10,000 kms. Four units out of the 6 initially planned are produced, with a gradual commissioning: Le Triomphant in 1997, the Téméraire in 1999, the Vigilant in 2004 and the Terrible in 2010. Based at Ile Long, they now operate for themselves. four nuclear deterrence of France, by being integrated within the Strategic Oceanic Force.

      Choose your poster among the 4 SNLE-NG: Le Triomphant, Le Téméraire, Le Vigilant or Le Terrible 

      Poster produced on iPad Pro and Procreate in 2020.

      PROFSNLENG
      5 Items

      Data sheet

      DimensionsA2 (16,5 in × 23,4 in)
      PaperMatte 135 g/m²

      Specific References

      No customer reviews for the moment.

      Write your review

      Poster profile ssbn ng (to choose)

      DISPLAY IN HD

      Choose your poster among the 4 SNLE-NG: Le Triomphant, Le Téméraire, Le Vigilant or Le Terrible 

      Write your review

      Customers who bought this product also bought:

      16 other products in the same category: